Remove One Temporary Shear Strip |
Fair The Edge Strips |
One Shear Strip Is Installed |
A 2X4 Acts As A Clamping Surface |
Next The Other Shear Clamp Strip Is Installed |
|
Some Of The Coaming Opening Region Strips Not Needed Are Removed |
All Strips Have Been Installed |
|
Back To The Strip Deck Main Page |