Hot Glue In Deck Beams And Bulkheads And Then Fillet Them In Place

Cutout Section Of Sheer Clamp 

 Make And Install Block

Drill Channel For Deck Line

Epoxy Channel Surface

 Install Blocks For Carbon Rods And Drill Holes For Inserting Them

Glue In Carbon Rod And Then Trim Off Excess Material

Trim Deck Beams Level

Trim Blocks Level

Back To Deck Support Main Page