| Temporary frames are removed once fillets are put in the bow and stern areas | 
| Bow stem is made to conform to bow space. Material is cut from 5/4 clear cedar. (same applies to stern stem) | 
| Stem is made and bow top plate cut back | Stem inserted into bow space | Side view of stem inserted into bow space | Stem clamped and glued | 
|  | 
| Bow and Stern fillets are now installedTack fillets are put in between the wire ties | 
| Back To The Hull Assembly Main Page |